This is an archival version of the original KnowledgePoint website.

Interactive features have been disabled and some pages and links have been removed.

Visit the new KnowledgePoint website at https://www.knowledgepoint.org.

 

Revision history [back]

click to hide/show revision 1
initial version
Steve Prior gravatar image

For inductive loads (electric motors) on a generator, it is common practice to use a factor of 3 to allow for start-up power surge. To minimize this load where several inductive appliances are driven by a single generator, the appliances should all be shut off before generator start-up and each one sequentially switched on at a minimum of 1 minute intervals. Generator shut-down can be done without reversing this procedure.