Revision history [back]
Pauline, David,
There has been a lot of work done at de Montford Unicversity by the De Montofrd Medical Waste Incinerator Group (MWIG) that was set up by Pofessor Picken, who I believe has now retired, but possibly still active. They have a website https://www.mw-incinerator.info/en/301_structure.html and also a series of designs. The largest capacity seems to be 50 kg per hour of waste, which may be sufficient for your needs, but I am sure they would be able to provide assistance if a larger capacity would berequired.
I hope this helps,
Regards,
Jeff